Step 4. Recycled Material Mixed and Laid 

Step 4-Recycling Laid.png
Step4  CUTLER_0208-086-recycling agent applicator-web.jpg

Recycling Unit

A stainless steel moldboard gathers the scarified material and conveys it into a center windrow, mixing the recycling agent into the material as it is moved into a center windrow. 

Step4  center windrow 59550030e red.jpg
Step4  material in front of recycling screed lores2.jpg

The windrow of recycled material is redistributed in front of a 4-section recycling screed that lays the material as a leveling course while it still has a residual temperature of at least 190 to 225 degrees F. 

Step4  CUTLER_0208 126 recycling screed - web.jpg
cutler logo - vertical - color 24 in x 12 in white text.png

Cutler Repaving Inc.
921 E. 27th Street
Lawrence, KS 66046

phone: 785-843-1524
fax: 785-843-3942

Quality  •  Experience  •  Innovation
Recycling Asphalt Pavements Since 1965

Copyright © 2024 Cutler Repaving Inc.  All rights reserved.

bottom of page